Skip to content
Michael Mathers

Using integrated design to achieve net-zero

Consulting-Specifying Engineer

Mar 26, 2014

Hood River Middle School’s Music and Science Building (Opsis Architecture) is featured in the latest issue of Consulting-Specifying Engineer, with author and Sr. Mechanical Engineer Andrew Craig expertly addressing the significant role integrated design plays in sustainable design and the steps that were taken to ensure this project achieved net-zero energy.

Beaverton Toyota aims for LEED Gold
The Fine Art of Mixed-Use Design