Skip to content
Michael David Rose

White Hill Middle School

Ross Valley Unified School District

Fairfax, California

Client: WRNS Studio

Building Size: 42,000 sf

Project Cost: $17.1 million

Certifications: This project was developed with Collaborative for High Performance Schools (CHPS) standards.

Interface Engineering was part of the master plan for White Hill Middle School’s 22 acre site as well as the master plan for a new multi-use building. Design included design and construction administration for two new classroom buildings. Keeping sustainability at the forefront, the project was designed with the first variable refrigerant volume heat pump radiant slab system in the country. Other sustainable features include:

  • displacement ventilation
  • CO2 occupancy sensors
  • variable refrigerant flow (VRF) systems for heating and cooling
  • photo-voltaic systems on the roof


News & Awards

  • Citation of Excellence Award, Learning By Design, 2014
Michael David Rose
Michael David Rose
American Geophysical Union Headquarters

Washington, DC

Sugar Bowl Academy

Norden, California