Staff Achievements Lauren Krueger and Kim Wall both earned their P.E license in Electrical Engineering. John Lansing earned his license as a Certified Plumbing Designer. Congratulations to all!
Stanford Healthcare Neuroscience Health Center The Stanford Neuroscience Health Center is a 95,000 square foot OSHPD-3 Medical Facility, and was designed to meet the Stanford Guidelines for Sustainable Buildings.
Stanford Linear Accelerator B40 Heinz Laser Laboratory Stanford Linear Accelerator (SLAC) required a laser laboratory for one of its leading scientists. Interface Engineering worked collaboratively with the end users, architect and building owner to achieve the optimized mixture of the required functionality, schedule and…
Stanford Outpatient Center Physical Therapy Clinic and Infusion Area Interface provided MEP engineering and fire/life safety services for Pavilion B of the Stanford Outpatient Center in Redwood City, California. The project includes the build-out of an OSHPD 3 Outpatient Physical Therapy Clinic and Infusion Area for chemotherapy on the…
Stanford School of Medicine 1215 Welch Road Lab Building The project is a new 195,000 GSF 3 story lab building with a complete lower level below grade. The project will displace existing modular offices as well as other end of life existing buildings on site. The building will house a new basic research and clinical research…
Stanford School of Medicine Jill and John Freidenrich Center for Translational Research This project is a new research building, for which Interface provided design/build performance specifications. The FCTR ground floor provides 7,000 square feet of space for participants and staff for conducting clinical trials and other human based research studies in…
Stanford South Bay Medical Office Building Cancer Center The recently completed Stanford Cancer Center South Bay is a world-class care facility in a patient-friendly setting.
Stanford University Escondido Graduate Residences Interface Engineering is providing Title 24 performance energy modeling services for 4 dormitory buildings and 1 common area pavilion: Building A: 515,000 sf residence Building B: 450,000 sf residence Building C: 450,000 sf residence Building D: 280,000 sf residence…
Stanford University CJ Huang Building The CJ Huang building for the Stanford School of Medicine is a 31,000 gross square foot, three-story building with a 19,000 gross square foot basement garage located in the Stanford University Medical Center. This design-build project consists of offices, conference…
Stanford University GSB Highland Hall Highland Hall is a new residential and academic building for Stanford’s Graduate School of Business.
Stanford University Lagunita Court Student Housing This construction project includes two new undergraduate residences, each with adjoining resident fellow residences. Both new houses will be four-class residences, each providing beds for 100 (200 total) undergraduate students (including Resident Assistants), two new…
Stanford University Linear Accelerator Center Building 52 Since 2010, Interface provided expert HVAC, plumbing, electrical, energy modeling, and commissioning assistance for new construction, renovations, infrastructure and system upgrades on the Stanford University Medical Center Campus and Stanford Linear Accelerator…