Yost Grube Hall Architecture
Chevron-Texaco Office Building
Encouraging self-sufficiency and energy-efficiency, this high-performance building has a prime power plant, a water treatment plant and a central cooling plant.
Interface provided MEP, lighting, technology and fire/life safety design services, and peer review of the local engineering construction documents for the Chevron-Texaco office building in Angola. The facility includes seven floors of office space (21,500 m²) including a data center and two floors of parking garage (13,600 m²).